AT&T SB35020 Specifications Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 116
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
Syn248 Installation and Configuration Guide Back to Contents
Installation 17
Gateway Installation
Figure 4. Gateway Grounding Terminal
Connect the telephone lines to the Gateway:
1. Remove the plastic covers from the Gateway LINE ports to be used, as shown in
Figure 5.
Figure 5. Gateway Telephone Line Connections
2. Plug up to four telephone lines from the telephone wall jacks into the Gateway.
Figure 6. DSL Connection
The Gateway grounding terminal shown in Figure 4 must be connected to
reliable earth ground using a separate ground wire before connecting the
telecommunication lines. The connection to earth ground must be verified by
qualified personnel.
Grounding Terminal
If your service provider uses Centrex lines, you must log in to the WebUI and
enter a line access code for each line to allow calibration to take place. Before
connecting the PSTN lines, connect the Gateway and one Deskset to the
network, then see “Logging in to the WebUI” on page 27 and “Line Calibration
Configuration” on page 67.
DC 5.1V
LINE 1
LINE 2 LINE 3 LINE 4 BYPASS
LAN
RESET
LINE 1
LINE 2
LINE 3
LINE 4
POWER
SELECT CANCEL
DOWN
UP
+-
If you subscribe to Digital Subscriber Line (DSL) high-speed Internet service
through your telephone line, you must plug each telephone line with DSL
service into a DSL filter. Then plug the DSL filter into the telephone wall jack,
as shown in Figure 6.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 115 116

Comments to this Manuals

No comments