AT&T 1145 Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 8
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
Page 7 of 7
6) Power-up and Test
a) Power the S1145R by plugging the AC power cord into an unswitched outlet.
b) Verify that the LED on the Power Unit is constant green. If it is not, check the
AC power cord connection at the Power Unit and the power outlet.
c) Verify that the green power LEDs on the NT1s connected to the 1146B
Distribution Unit are on. If none of the NT1s are powered, check the connection
of the Distribution Unit Power Cable Adaptor at the Power Unit and the
Distribution Box. If an individual NT1 is not powered, check the connection at
the 1146B punchdown block.
d) Verify that the Battery Charge Status LED on the S1145B Battery Pack is either
flashing green (Charging) or solid green (Fully Charged). If it is not, check the
connection of the Battery Connection Cable at the Power Unit and the Battery
Pack and verify that a good fuse is installed in the fuse holder on the right side of
the Battery Pack.
a) Unplug the AC power cord on the Power Unit. Verify that the LED on the Power
Unit is constant red and the LEDs on the S1145B Battery Pack are off. Verify
that the NT1s are still powered. (Under very light load conditions, it may take
several minutes before the LEDs change state. The Battery Charge Status LED
on the Battery Pack will display constant or flashing red to indicate a Power Unit
Fault.)
e) Reconnect the AC power cord on the Power Unit. Verify that the LED on the
Power Unit is constant green and the Battery Charge Status LED on the S1145B
Battery Pack is flashing green (Charging).
Page view 7
1 2 3 4 5 6 7 8

Comments to this Manuals

No comments