AT&T System 75 8520T User Manual Page 81

  • Download
  • Add to my manuals
  • Print
  • Page
    / 115
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 80
Start-Up, Testing, and Troubleshooting
Initial Testing
The following procedures are to aid in testing your
new installation. These tools will be very helpful in
establishing the electrical operability of the
system. All of these tests are to be entered via
installer programming from the OFF Level of
Protection.
Siren Test
Relay
Test
In the same manner, select programming function
012; it will test the relays, just as
Fn#011
tested
the sirens. Again,
“1”
and “2” plus [SELECT] will
energize the relays,
“0”
and [SELECT] will
de-
energize them.
X-10 Test
From the “Function Number” menu, enter
#011;
it
will allow you to turn the sirens on and off from
any Display Control Keypad. Once in Fn#01
, 1,
press
“1”
and [SELECT] and siren #1 should turn
on. Press “2” and [SELECT] and siren
#2
should
turn on. Press
“0”
and [SELECT] to turn off the
siren(s). After turning the siren(s) off, the system
returns to the “Function Number” menu.
The X-10 test also works in a similar manner from
Fn#013
to turn on and off up to 8 of the X-10
receiver units. (Make sure that the X-10 option is
installed in the CCU and that it and the receiver
units are set to the same house code.) Press any
number from 1 to 8 and [SELECT] to turn on the
receiver with the same code. Press “0” and
[SELECT] to turn all units off.
AT&T Security System 8300 Installer’s Manual
4-1
Page view 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 114 115

Comments to this Manuals

No comments